Assumption University AV Upgrade in Hagan Hall
Key Code Media recently completed an extensive audio-visual upgrade at Assumption University in Worcester, Massachusetts. The project focused on enhancing the entertainment and event capabilities of Hagan Hall’s second-floor venues: Pierre’s Pub, Game Room, and Coffeehouse Stage. The upgraded facilities are now equipped to handle a wide range of activities, including sports viewing, live music […]
Washington State University Upgrades TV Studio for Next-Gen Education
In a thoughtful $1 million redesign, the KWSU-TV studio at Washington State University has undergone a transformative renovation, enhancing the learning experience for Journalism and Media Production students in the Edward R. Murrow College of Communication. For more than 50 years, KWSU-TV has served as a training facility, bringing students together to test their skills in a real-world environment, culminating […]
California College: Hybrid-Ready AudioVisual Upgrade To 48 Classrooms
Anonymous Featured Work | Genuine Stories, Preserving Privacy For Customers California Country (CC), a distinguished public university located in California, is committed to providing its diverse student body with exceptional educational opportunities. Recently, CC embarked on a transformative journey to enhance its learning environments through comprehensive audiovisual integration upgrades. In collaboration with Key Code Media, […]
OSU Spears School of Business – 5 Floors of Classrooms & Auditoriums
Build out of all AV for new OSU Spears School of Business building. Included 5 floors, multiple classrooms, auditoriums, Watson Trading Floor, Digital Signage, Wayfinding Displays, Room Scheduling Panels/System, LED Walls, Donor Wall, Fibre and Networking, etc. Evertz AV, Crestron, Planar Systems LED Ribbon Ticker 66ft, Planar 3×3 LED wall, RP Visuals Custom Fabricated Structures, 3x NEC LED Walls, Signage Kiosks, 29 Panasonic […]
UC Davis Classroom & Auditorium Audiovisual Upgrade
4 CLASSROOMS & AUDITORIUM – BUILT FROM THE GROUND UP Key Code Media was approached by Steven Edington, UC Davis IET Communications Resources, to bid on a project to upgrade the AV infrastructure in 4 classrooms and auditorium in Young and Wellman Halls in the summer of 2020. The equipment list for this project was […]
Biola University Gets Serious About Production For Digital Learning Explosion During Remote Times
Biola University’s Digital Learning and Program Development is tasked with the creation and design of online and hybrid learning programs. With gradual investments in production and post-production technology, consulting with Key Code Media, and hiring the right staff- the department has grown from producing only one course every 3 months to delivering about 2,500 videos […]
Augustine Institute Upgrades Classrooms and Production Systems
Key Code Media managed the design, cabling, and installation of the Augustine Institute Classroom presentation and production system.
WHUT, Howard University Upgrades Master Control
Key Code Media developed the technical system design for the master control at WHUT-TV/Channel 32 in Washington D.C. The project included designing an automated and server-based digital master control system and technical core. The digital production infrastructure in the master design was developed to allow WHUT to upgrade to digital production facilities and a master […]
Texas Christian University (TCU) Upgrades Broadcast Equipment
Key Code Media designed and integrated a centralized control room serving athletic venues across campus- including a 5ME Grass Valley Switcher, EVS, Ross Xpression and Chryon Graphics, Routing, and Fiber infrastructure.
University of Michigan Upgrades North Quad TV Broadcast Equipment
BURST, A Division of Key Code Media provided engineering design services for the North Quad TV and Film Studios at the University of Michigan in Ann Arbor. BURST created a complete drawing package and equipment list for three studios: a 2,500 square foot film studio, a 1.250 square foot television studio, and a 2,400 square […]